Skip to content
Fort Lauderdale, FL · Licensed across FloridaMon–Fri 8:00 AM – 5:00 PM · (954) 807-3208
Romco BuildersCall

What we renovate · Lobby & Public Areas

Renovating the First Impression While Selling It

The lobby is what the hotel sells, and it has to keep selling it while being rebuilt.

Key count, the scope you are facing, and your occupancy pattern. Those three tell us whether the program is achievable.

Occupied

Guests are inside the building while we work

Per key

The number that decides whether the project works

Shoulder

Florida seasonality dictates the program

Licensed

General contractor, licensed in the state of Florida

The arrival experience is the product

A guest's impression is formed in the first ninety seconds, and during a lobby renovation those ninety seconds include hoarding, a temporary desk and a diverted route. Managing that is not decoration — it directly affects reviews, which affect rate, which affects the return on the renovation itself.

The temporary reception is the part most often improvised. It gets set up in whatever space is free rather than designed, which means the front desk team spends months working somewhere that does not function while trying to deliver the arrival experience the hotel is selling.

What has to be planned

  • A temporary reception that actually works operationally.
  • A clear arrival route, signed properly rather than improvised.
  • Bags, valet and arrival logistics through the works.
  • Hoarding that looks deliberate rather than like a building site.
  • Phasing so the space is never entirely unusable.

Planning the arrival sequence

Walk it as a guest would: from where the car stops, through the door, to whoever greets them, to the lift. Every one of those steps has to work during the renovation, and each is a decision rather than something that resolves itself.

The most common failure is signage. A guest who cannot immediately see where to go has already formed an impression, and clear temporary wayfinding is one of the cheapest things on the entire project.

How we handle it

  1. 01Plan the temporary operation with the hotel before mobilizing.
  2. 02Build hoarding that presents well, not just complies.
  3. 03Phase so arrival and departure always work.
  4. 04Do the loudest work outside peak arrival hours.
  5. 05Clean continuously — the lobby is on show at all times.

Spend real money on the hoarding. A well-finished, well-signed, well-lit hoarding tells guests the hotel is investing in itself. Plywood and a handwritten sign tells them the hotel is falling apart, and the reviews say so.

Said plainly

Where we stop

A lobby renovation will affect guest experience however well it is managed. We will be honest about the extent rather than promising an invisible project that does not exist.

FAQ

Common questions

Can the lobby stay open?
In phases, with a temporary reception planned properly rather than improvised.
Does hoarding quality matter?
Considerably. It is the difference between "investing" and "falling apart" in a review.
When is loud work done?
Outside peak arrival and departure hours.
Will guests notice?
Yes. We will be honest about how much rather than promising invisibility.

Next step

Find out what is actually wrong with it.

An inspection, photographs of what we found, and a written scope. If the honest answer is that it can wait another season, that is the answer you will get.